hahdbehzhsHelo2517 hahdbehzhsHelo2517
  • 25-04-2024
  • Engineering
contestada

If a channel on a 4-year construction project was sized to carry the peak runoff rate of a storm with a 5% probability of occurring, what would be the chance (risk of failure) that a runoff event would exceed this capacity?

Relax

Respuesta :

Otras preguntas

Help ASAP plz !!!!!!!!
write a point slope equation for the line that has slope 13 and passes through the point (15,12) do not use parenthesis on the y side
2- Your friend invites you to attend his birthday party. You Refuse and give areason for refusing.​
The Soviet Union worked with the united states great britain and other countries to defeat germany based on the timeline which event most likely caused them to
Energy is needed to break bonds in chemical reactions
Ella _____ (pensar) que su novio es guapo. piensa pensa pienso penso
I need help asap please and thank you
Carlos has some soil that has too much sand mixed in for growing plants. What should he add to improve the soil for growing plants? A) bugs B) clay C) pebbles
Given the system of equations: 2x – y = –2 x = 14 + 2y Answer the following: A) What is the value of the system determinant? B) What is the value of the y−deter
find the exact values of sin pi/12