dontcare8733 dontcare8733
  • 22-03-2024
  • Mathematics
contestada

The cost to repair the leaks are: $263 for materials, $200 for labor. Find the cost savings accrued from fixing the leaks, and how much time it takes to recover the costs or the so-called payback time.
a) $463, 2.315 months
b) $463, 0.854 months
c) $463, 1.354 months
d) $463, 3.215 months

Relax

Respuesta :

Otras preguntas

The avocado own a 1/4 acre orchard. Two fifths of the orchard  is planted in orange trees. What fraction of an acre in planted in orange trees
can she buy enough packs ?
What Are Genre Conventions?
To make concrete it takes 8 parts crushed gravel, 7 parts water and 5 parts cement mix. A worker needs to make 220kg of concrete. How much crushed gravel, water
i don't get area and the distributive property
An increase in which quantity will result in an increase in momentum?
If a force does not act parallel to the resulting displacement, what is the effect on the work done by the force?
The charges on a monthly water bill came to $0.86 per cubic meter of water used, plus a service charge of $4.49. Last month Jeremy's water bill came to $69.85,
can she buy enough packs ?
Please answer any of these thanks !