amclinger4974 amclinger4974
  • 22-02-2024
  • Engineering
contestada

What is the disadvantage of placing a PFM over an etched bridge?
a) Reduced structural integrity
b) Increased manufacturing cost
c) Difficulty in maintenance
d) Limited aesthetic options

Relax

Respuesta :

Otras preguntas

In what ways did the Phoenicians impact the Mediterranean world????
Which construction is illustrated above ?
As a child, I _______________ with dolphins many times. a. we dreamed b. I had dreamed c. you had dreamed
Convert 453° to radians. A) 151π 30 B) 151π 60 C) 151π 90 D) 151π 120
a dog ate 5 buns then his Owen gave him 18 more how much is that?
In 1999, the U.S. announced trade sanctions worth $116.8 million, targeting goods from France, Germany, Italy and Denmark. The sanctions were in retaliation fo
A group of 6 friends decide to split the cost of a vacation together. If the vacation costs $3,300, how much does each friend have to pay?
¿Vas a treat unas sandalias a Costa Rica? Si ______ voy a tracer porque voy a la playa
Why do all cells have identical dna
what angle of rotation will transform point (-10,7) to (-6,-10)