Which type of system would you use to change a production schedule if a key supplier was late in delivering goods?
A) Executive Support System (ESS)
B) Transaction Processing System (TPS)
C) Management Information System (MIS)
D) Decision Support System (DSS)

Relax

Respuesta :

Otras preguntas

why does alaska have really long days during some times of the year and really short days during other times?
6.___He journeyed to the court of the great Kublai Khan, returning to Europe after seventeen years.
The following 3-D object is composed of identical cubes. The volume of the 3-D object is 56cm cubed. The surface area of the 3-D object is a) 30cm squaredb) 60c
what is the pink panther?
what is nationalism
what are the kinds of formulas to remember in 8th grade?
A 430 g football is lying on the ground, then is kicked and is moving at 25 m/s. If the duration of the impact was 0.0010 s, what was the average force on the b
For which system of equations is (2, 2) a solution? A.–3x + 3y = 0x + 6y = 10B.–2x + 5y = –64x – 2y = 4C.5x – 2y = –63x – 4y = 2D.2x + 3y = 104x + 5y = 18
In the given figure , if angel ROQ = 90 and angel POS : angel ROS = 4 : 5 , then the value of angel SOQ is
what is a subspecies?