jeremiahp7164 jeremiahp7164
  • 21-11-2022
  • Business
contestada

a budget that is based on a single estimate of sales volume is called a: multiple choice static budget. flexible budget. variable budget. sunk cost budget.

Relax

Respuesta :

Otras preguntas

In the pictures down belowCan anyone help? Fractions and percents
1. Sometimes in very cold places water pipes burst. Give reason why.
Help me please stumbling block 1. respectful 2. a mockery 3. abstract 4. an obstruction
1. Explain with reasons why burning of paper is a chemical change.
write the slope intercept equation for the line that passes through (-8,11) and is perpendicular t 2x -7y=14
How long does it take the ferris wheel to make one full rotation?h(t)=9sin(20(t-pi/2))+12        , h in metres and t in seconds
use the intercepts to graph the equation 4x-2y=8 please help me solve and graph
C+(4-3c)-2=0 Need help
In the novel "how to kill a mocking bird",chapter 1-paragraph 3. what does this sentence really mean-"If General Jackson hadn't run the Creeks up the creek, Si
For all real numbers  x  and  y, if  x # y = x(x-y), then x # (x # y) =My question is, how does x # (x # y) = 8 and how does it also equal to x(squared) - x(cub