cvillalpando812 cvillalpando812
  • 24-09-2022
  • Mathematics
contestada

A fiber optic cable company is installing cable along a road 6 1/2 miles long. The crew takes a day to install each 1/4 mile of cable. How many days will the installation take?

A fiber optic cable company is installing cable along a road 6 12 miles long The crew takes a day to install each 14 mile of cable How many days will the instal class=
Relax

Respuesta :

Otras preguntas

Use an area model to solve. 2 2/3 x 1 1/3?
PLEASe help. How many ions? With picture.
Which word describes the usual relationship between Jean and Lin Nai-Nai in "Homesick"? a. argumentative b. warm c. intense d. awkward
What's the formula for finding out how many yards of fabric I need for a quilt.
. In a communist regime, the government controls only a portion of 4 and economic activity. a. True b. False
Which words in this sentence make up the verb phrase? Have you ever seen a comet in the night sky? a. have you ever b. ever seen c. have seen d. seen a
11 is what percent of 55
how many 2.5 inch by 6 inch tiles will fit on a back splash that is 2.5 feet tall and 8 feet long
how much is 5000 pounds in ounces
What is the meaning of intervention in the following sentence? The growing conflict was stopped, thanks to Steven’s intervention.